Webmaster's note: This list of illustrations has been created for the convenience of the users of this HTML version of this article and did not appear in the original article in The Gamut. The caption for each photo is displayed and users may, from here, go to the section of text in which the illustration appears, or see the a JPEG version of illustration at either 300 or 150 dpi.

ILLUSTRATIONS

Figure Caption
Section
300 dpi
150 dpi
1. Walter Leedy, an Associate Professor of Art at Cleveland State University,. . . .
Author
gamut39.jpg
gamut39t.jpg
2. The southwest corner of Euclid Avenue and Ontario Street as it appeared in 1922, before demolition for new construction. The site is now occupied by the Higbee Company, part of the Van Sweringens' efforts to create a high-density development. The writing on the photograph indicates land parcels that the Van Sweringen interests were acquiring. Photo: Gerald Adams collection.
1.
gamut40.jpg
gamut40t.jpg
3. The Burnham Commission's plan for the Cleveland Mall, including buildings projected for the near and distant future. From 1903 until 1919, the anticipated site for the new Union Station (1) was to be at the end of the Mall near the lake. Recognizable in this rendering are Public Square (2) and Euclid Avenue (3) Drawing from the Commission Report, reproduced in Charles Moore, Daniel H. Burnham (1921)
2.
gamut41.jpg
gamut41t.jpg
4. The Union Station that never was; one of several proposed schemes done between 1915 and 1917 for the new terminal to be located on the lakeside end of the Mall. Drawing by the architectural firm of Graham, Anderson, Probst and White. Gerald Adams collection.
2.
gamut42.jpg
gamut42t.jpg
5. Oris Paxton (b. 1879) and Mantis James (b. 1881) VAN SWERINGEN came from a farming area near Wooster, Ohio. . . .
Sidebar
gamut43.gif
gamut43t.gif
6. This prospectus illustrates how other entrepreneurs jumped on the Van Sweringens' band wagon, hoping for magnificent profits through real estate sales and speculation. Pamphlet, author's collection.
3.
gamut44.jpg
gamut44t.jpg
7. Map from Engineer's Report of March, 1917, showing the track layout for the stub-end station planned at that time for the southwest quadrant of Public Square. Plans were still going ahead for a Union Station on the lakeside end of the Mall. Gerald Adams collection.
3.
gamut45.jpg
gamut45t.jpg
8. Design for the Union Station on Public Square, as of August, 1918. The Hotel Cleveland (right wing),already built, was to be a subordinate element in the overall design. Reproduced from Engineer's Report, 1919, CSU Archives.
4.
gamut47.gif
gamut47t.gif
9. Terminal Tower, architect's rendering, early 1925. Ornamental figures along portico were later eliminated because of expense. CSU Archives.
9.
gamut53.jpg
gamut53t.jpg
10. Proposed plan at station level, 1921. One in a series of proposals based on a main, single ramp which led down to station area. CSU Archives
9.
gamut54a.jpg
gamut54at.jpg
11. Double ramp plan of entrance portico at street level, as actually built, 1930. Comparison with the earlier plan (left) shows shift in visual emphasis from station to office tower. Drawing reproduced from Railway Age.
9.
gamut54b.jpg
gamut54bt.jpg
12. Looking west from Hotel Cleveland, August, 1926. The future site of part of the station after clearing but before excavation. Note streetcar slit in middle of Superior Avenue, leading to a lower level of the Detroit-Superior Bridge. CSU Archives.
9.
gamut55.jpg
gamut55t.jpg
13. Future site of Higbee's Department Store,October, 1926, after partial excavation and construction of retaining walls along Ontario Street. Excavated material was hauled by train and truck to the west side and to the lakefront, where it was used as fill. CSU Archives.
9.
gamut56.jpg
gamut56t.jpg
14. Stones for the portico on Public Square came pre-cut from the quarry and had only to be assembled.
9.
gamut57a.jpg
gam57at.jpg
15. The sides of Public Square converging on the portico had to be graded downward towards the entrance. Note how much of the site had to be excavated. CSU Archives.
9.
gamut57b.jpg
gam57bt.jpg
16. On August 18, 1927, a flag flies atop the completed steel skeletal frame to celebrate the steelworkers' achievement.
9.
gamut58a.jpg
gam58at.jpg
17. Interior view of portico, under construction in January, 1928. It was imperative to finish this entrance so the tower could be opened to tenants. CSU Archives.
9.
gamut58b.jpg
gamut58bt.jpg

 


Table of Contents